Demo
EN (CA)
EN (CA)
Get demo

MT81 Cloud-Managed Security Trailer

Calculate uptime and cost for your trailer configuration

A trailer’s uptime depends on the sunlight it receives, its battery capacity, and the power draw of connected devices. To guide your configuration, estimate uptime and cost by selecting deployment location, model, and devices below.

Select your location

Please enter the ZIP code where your trailer will be deployed.

Configure your trailer

For the easy-button choice, you can select a Verkada-validated configuration (VVC). Or, you can customize your MT81 trailer with up to six devices plus a gateway.

The MT81 comes in two variants: the MT81-6KWH and the MT81-13KWH, which has double the battery capacity. For more information, please refer to the datasheet.

Understanding your configuration options

VVC 1 covers core security needs: remote monitoring, investigations, and deterrence.

VVC 2 provides zero-compromise security with maximum coverage, including automated license plate recognition (ALPR).

Custom gives you the flexibility to add up to six devices plus a gateway to fit your security needs.

Please enter a ZIP code above

Choose your configuration:

Qty
Products
Price (MSRP)

2

CP52-E PTZ Camera

$7,398

1

CF83-E Fisheye Camera

$1,799

1

BZ11 Horn Speaker

$799

1

GC31-E Cellular Gateway

$1,299

Qty
Cloud licenses
Price (MSRP)

3

1-Year Camera License

$597

1

1-Year Horn Speaker License

$199

1

1-Year Cellular Gateway License

$299

1

1-Year Security Trailer License

$349

Qty
Additional Mounting Accessories
Price (MSRP)

Multisensor, fisheye, and dome cameras require additional mounting accessories.

1

Pendant Cap for CF83-E

$69

Select your cellular data

$2,997

$0

Select your trailer

$58,000

$65,000

Estimated hours offline (per year)

-

Estimated uptime

-

Battery runtime without charging

-

Total cost (MSRP)

$70,808

Real-world uptime can be affected by a variety of factors, such as solar panel orientation and weather variation. Uptime projections are based on simulated data and assume unshaded, south-facing solar panels. AC shore power availability is recommended for deployments with <99% uptime.